-
Economics of Climate Change Adaptation
Client:IWM, 2010
-
Flood Shelter Project
Client: PLAN, Bangladesh
-
Physical Model Test of Modhumoti River
Client: RRI
-
Assessment of Technical Proposals
Client: Policy Support Unit (PSU)
Ministry of Local Govt. Rural
Development & Cooperatives
-
Meghna river basin Estuary
Client: JICA
-
Environmental Sustainability Study
Client:
-
Bangladesh Water Management Improvement Project
Client:IWM, 2010
-
Comparative Study of River Bank Protection and
Erosion Control Practices in Bangladesh.
Client:JICA, 2010
-
Expert opinion on 'Indian River Linkage Project:
Impact on Bangladesh'
Client: WARPO, 2007-2008
-
Expert opinion on 'Resource Assessment and Monitoring of
Water Supply Sources for Dhaka City'.
Client: Dhaka WASA, 2004-2006.
-
Environmental and Social Impact Study on South Zone Power Distribution
Project.
Client:
Power Cell, PDB. October, 2008-March, 2009.
-
Use Existing Data on Available Digital Elevation Models to Prepare Usable
Tsunami and Storm Surge Inundation Risk Maps for the Entire Coastal Region.
Client:IWM, January, 2009.
-
Checking of Design of Uttara Residential (3rd Phase) – RAJUK
Client: RAJUK, 2009-2010
-
Thakurgaon Irrigation Project, Unit-2
Client:
IWM, June, 2009
-
Hydrological Study for the Chittagong Site of Asian University for Women.
Client:Bureau Happold, UK , 2009
-
Development of Navigability of two nos. Inland Waterways and one no. Khal
connected to Baulia River by dredging. Client: BIWTA, 2009.
-
Development of Mathematical Model for the Research on the Effect of Bandalling on River Flow and Morphology. Client: RRI, 2006-2009
-
Compatibility of GIS data , Meta data, Data sharing, Protocol and Natural
GIS policy. Client: CEGIS, 2008.
-
Integrated Development of Hatirjheel Begunbari Khal: RAJUK Component.
Client: RAJUK, 2006-2009
-
Formulation of Outline Participatory Perspective Plan. 2009.
-
Use Existing Data on Available Digital Elevation Models to Prepare Usable
Tsunami and Storm Surge Inundation Risk Maps for the Entire Coastal Region.
Client: IWM, 2009.
-
Preparation of look up table and generation of PRECIS
scenarios for Bangladesh.
Client: Climate Change Cell (DoE), 2007-2008.
-
Estimation of Seepage and Percolation Loss from
Irrigation Rice Field.
Client: IWM, 2006-2007.
-
Advisory Services on Research on the Effect of
Bandalling on River Flow and Morphology.
Client: RRI, 2005-2008.
-
Advisory Services on various projects related to river
engineering.
Client: IWM, 2006.
-
Advisory Services on Dredging Activities.
Client: BIWTA, 2006.
-
EIA of Muktarpur Bridge.
Client: CEGIS, 2007
-
Kurigram Irrigation Project.
Client: IWM, 2007
-
Regional Implications of Water Resources management
Interventions in South Asia.
Client: Action Aid, 2007
-
Development of a Base Document in the Backdrop of
Climate Change Impacts: Characterizing Bangladesh Country Settings.
Client: Climate Change Cell (DoE), 2007
-
Economic modeling of adaptation measures to climate
change.
Client: Climate Change Cell (DoE), 2007-2008.
-
Capnet lecture for training on IWRM.
Client: BCAS, 2007
-
EIA of Power Plant Project at Shiddirgang.
Client: EGCB, 2006
-
Development Proposal for Uttara Residential Model Town (3rd Phase)
Project. Client: RAJUK, 2003-2004.
-
Impacts of Sea Level Rise on Land Suitability and
Adaptation Options. Client: CEGIS,
2004-2006.
-
Estimation of Seepage and Percolation Loss from
Irrigation Rice Field under 'Groundwater Model Study for Deep Tube Well
Installation in Barind Area'. Client: IWM, 2005-2006.
-
EIA of Eastern Bypasss.
Client: CEGIS, 2005.
-
Training Program on Mathematical Modeling for the
Research on the Effect of Bandalling on River Flow and Morphology. Client: RRI, 2006.
-
Command Area Development of Thakurgaon Irrigation Project.
Client: IWM, 2005.
-
Advisory services on various projects of CEGIS, Client: CEGIS, 2004.
-
Advisory services to Environmental Impact Assessment of Padma Bridge, Client: Bangladesh Consultants Ltd. (BCL),
2004.
-
Techno-economic feasibility and environmental assessment of the proposed
multi-purpose development of lowlands adjacent to Sonargaon Hotel; Client: RAJUK, 2004.
-
Minimum Environmental Flow Requirement for Ecosystem and its Functioning; Client: IUCN, 2004.
-
Vulnerability analysis of coastal livelihood groups in the coastal zone
of Bangladesh; Client: CEGIS, 2003-04.
-
Impact of Climate Change on Streamflow Vulnerability on Urban Runoff, Client: IUCN, 2004.
-
An
Investigation on Flood Flow Vulnerability and Environmental Impacts of
Mayakanon Project, Eastern
Housing Ltd., Dhaka, 2003.
-
Design
of the Modules in the Computational Frameworks for WARPO,
Client: Environmental and Geographical Information Services (CEGIS), Dhaka,
2003.
-
Feasibility
Study of a Comprehensive Study for Drainage and Flood Management in the
Manu-Kushiyara-Khowai-Dhalai Systems,
Bangladesh Water Development Board (BWDB), Dhaka, 2003.
-
Monitoring
and integration of Khulna-Jessore Drainage Rehabilitation Project,
Center for Environmental and Geographical Information Services (CEGIS),
2002.
-
Project
formulation study for the establishment of Hi-Tech Park at Kaliakoir,
Ministry of Science and Technology, Dhaka, 2002
.
-
Development
of the Knowledge portal on the estuary development, Center for Environmental and Geographical Information Services (CEGIS),
Dhaka, 2002.
-
Command
Area Development of Teesta Barrage Project,
Surface Water Modelling Centre (SWMC), 2001-3.
-
Investigation
on the Failure of Karchar Haor, Sunamganj, Ministry of Water Resources, Government of
Bangladesh, 2002.
-
Computational
Framework for WARPO's Future Strategic Water Resources Planning,
December 2001- January 2002, Center for Environmental and Geographical
Information Services (CEGIS), Dhaka.
-
Development
of Flood Dynamic Model and Improvement of STREAM Computation Engine,
July 2000 - January 2002, Center for Environmental and Geographical
Information Services (CEGIS), Dhaka.
-
Manual
on Hydrologic and Hydraulic Design of Bridge and Related Infrastructure,
Surface Water Modeling Center (SWMC), Dhaka, 2000
- 2002.
-
Review
of World Commission on Dam's Report of Dams and Development,
by Bangladesh Water Partnership (BWP), 2001.
-
Updating
of Existing Groundwater and Land Subsidence Model Project, June 1999 - December 2000, Water and Sewerage Authority, Dhaka (DWASA).
-
Hydrological
Studies of the Ganges, Brahmaputra and Rivers of the Ganges Dependent Area,
OGDA Studies, National Water Management Plan (NWMP), Sir William Halcrow and
Partners, December 1999 -April 2001.
-
Learning
Lesson of 20 Years of Bangladesh Water Development Board's Early
Implementation Project Experience, Environment
and GIS Support Project (EGIS) of Water Resources Planning Organization (WARPO),
1998-99.
-
Investigation
into the damage to the works of contract B2 at Sirajgonj during Monsoon
1998, River Bank Protection Project (RBPP),
Bangladesh water Development Board (BWDB), Dhaka 1998.
-
Investigation
on LGED Activities Interfering with BWDB Projects, Ministry of Water Resources, Government of Bangladesh, 1998.
-
Evaluation
of consultancy proposals on National Water Management Plan, WARPO, Ministry of Water Resources, Government of Bangladesh, 1997.
-
Final
Evaluation of System Rehabilitation Project of Bangladesh Water Development
Board, University of Leeds, U.K.,
1997.
-
Floods
loss reduction in Bangladesh: Integrating environmental considerations into
economic policy making processes,
prepared for UN-ESCAP, Bangkok, 1997.
-
Numerical
modelling in relation to Cyclone Shelter Preparatory Study, Danish Hydraulic Institute 1996-97.
-
Physical
model investigations, Jamuna Multipurpose Bridge, River Research Institute (RRI), Faridpur, 1995-1997.
-
Feasibility
study of floating pump station in Ganges-Kobadak project,
Bangladesh Water Development Board (BWDB), 1995-1996.
-
Feasibility
of Floating Pump in Ganges-Kobadak Irrigation Project, Bangladesh Water Development Board (BWDB), 1996.
-
Appropriate
institutional form for Surface Water Modelling Centre, prepared for Surface Water Simulation Modelling Programme-III (SWSMP-III),
Technical Assistance by DANIDA, River Research Institute (RRI), 1995.
-
Pilot
Programme to Improve Management of Flood Control, Drainage and Irrigation
Projects: Phase II, Bangladesh
Water Development Board (BWDB) and The Ford Foundation, 1994-95.
-
Surface
Water Simulation Modeling Program Phase III,
Surface Water Modeling Center, Ministry of Water Resources, Government of
the People's Republic of Bangladesh, January 1994 - December 1996.
-
Flood
frequency analysis for revision of danger levels in Bangladesh, prepared for UNDP project, BGD/88/054, Surface Water Hydrology
Directorate of BWDB. 1994-1995.
-
Panel
of Experts for the Flood Action Plan (FAP),
UNDP Project BGD/90/004 and BGD/92/014, Flood Plan Coordination
Organization, 1992-1993.
-
Multipurpose
Cyclone Shelter Programme, UNDP
Project, BGD/91/025, Planning Commission, Government of Bangladesh,
1992-1993.
-
Manual
for land and water use plan,
Local Government Engineering Bureau, 1991.
-
Surface
Water Simulation Modelling Programme: Phase II,
United Nations Development Programme (UNDP) and World Bank, 1990.
-
Land
Use/Water Use Application Model for Upazila Detail Development Plan: Review
of Literature and Available Data Base,
Rural Employment Sector Programme, Local government Engineering Bureau,
1990.
-
Mathematical
Model Study of Pussur Sibsa River System and Karnaphuli River Entrance, Ministry
of Port and Shipping, Government of the People's Republic of Bangladesh, 1990 - 1992.
-
Prefeasibility
Study on Gopalganj Area Development Program,
Sponsored by Bangladeh - Canada Agriculture Sector Team, Canadian
International Development Agency, 1990.
-
Pilot
Programme to Improve Management of Flood Control, Drainage and Irrigation
Projects: Phase I, Bangladesh
Water Development Board (BWDB) and The Ford Foundation, 1989-91.
-
Review
and Optimization of Planning and Design of Irrigation and Drainage System of
Teesta Barrage Project,
Bangladesh Water Development Board (BWDB), 1989.
-
Surface
Water Simulation Modelling Programme,
United Nations Development Programme (UNDP) and World Bank, 1988.
-
Surface
Water Simulation Modelling Programme, Phase I,
UNDP Project BGD/85/045, Master Plan Organization, Ministry of Irrigation,
Water Development and Flood Control, 19986-1988.
-
Review
and Optimization of the irrigation and drainage system of the Teesta Project,
Bangladesh Water Development Board (BWDB), 1987-1988.
-
Surface
Water Simulation Modeling Program,
Master Plan Organization, Ministry of Irrigation, Water Development and
Flood Control, Government of the People's Republic of Bangladesh, September
1985 - August 1988.
-
Mathematical
model study of the River Karnafuli,
Chittagong Port Aurhority, 1984-1986.
-
Study
of Shifting Pattern of Jamuna River and Recommendation for Protection to
Caissons of the East-West Interconnector,
Jamuna River Crossing, Bangladesh Power Development Board (BPDB), 1983-1985.
-
Expert
services for civil repair works of the Karnafuli Hydrostation, Kaptai, Bangladesh
Power Development Board (BPDB), 1983-1984.
-
Modelling
of salt water intrusion in the Meghna Delta,
Expert Study Group, Ministry of Agriculture, 1983.
-
Post
construction evaluation (Technical) of the Early Implementation Projects,
Bangladesh Water Development Board (BWDB), 1983.